In a long tender, consistency is the hard part
A tender runs to dozens of sections, and company profiles, certifications and formatting rules have to be checked throughout. Splitting the writing across several people meant long hours reconciling wording and format, and any change had to be re-checked across the whole document.
Materials and rules become a Skill for the Tender Steward
With the agent’s help, she turned company materials, certifications, writing requirements and past experience into a Skill that lives in the Tender Steward. Now, when a public tender notice arrives, she forwards it, and the agent works through the sections by those rules.
285 pages delivered at once, and the bid won
The agent drafted every section and produced a 285-page tender. She told us she was happy with the result, and later that the bid had won. Review and submission stayed in her hands. The agent’s part was the drafting.
Result
Tender drafting · User report
Several people writing, then reconciling285 pages drafted by an agent, bid won
“I used your CogineWork to produce a 285-page tender, and I’m very happy with the result.”
Try it in your own work
Give the agent an existing reference document and your writing rules, and have it draft one section of a tender first
See how to begin